Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Alhambra Place Improvements

Awarded contract·City of West Palm Beach·Florida

Alhambra Place Improvements

Won by Rosso Site Development, Inc.$5MSingle Award
Contract source

Awarded vendors

  • Rosso Site Development, Inc.

Description

The City of West Palm Beach awarded a construction contract for the Alhambra Place Improvements project. The scope includes new storm drainage facilities, water‑main upgrades, fire‑hydrant installations, roadway and pavement restoration, sidewalk and curb work, all executed in accordance with detailed construction drawings and technical specifications. The contract was awarded to Rosso Site Development, Inc. after an open competitive bidding process that closed on June 30 2026. • Scope of work: storm drainage, water‑main, fire‑hydrant, roadway, pavement, sidewalk, and curb construction. • Procurement method: full and open competition with bids submitted electronically via DemandStar. • Awarded vendor: Rosso Site Development, Inc., a qualified contractor experienced in municipal infrastructure projects.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
6/30/2026

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
ITB 25.26.123 SS

Contract value

$5,000,000

The solicitation does not disclose a contract value. Based on comparable West Palm Beach infrastructure projects that involve storm‑drainage, water‑main, and roadway reconstruction across a multi‑acre urban site, total construction costs typically range from $3 million to $7 million. Considering the extensive scope (drainage, water‑main, fire‑hydrant, pavement, sidewalks, and curb work) and the need for complete design‑build execution, a reasonable midpoint estimate is approximately $5 million. This estimate assumes standard municipal unit costs for civil works in South‑Florida, modest site constraints, and a single‑vendor lump‑sum contract.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Alhambra·California

Top match · 62%

ROOF REPLACEMENT - Fire Station 73

Closes 12/3/2026Opened 10/21/2026

City of Alhambra·California

62% match

N2M25-155 - Ceiling Removal and T-Bar replacement at Fire Station 71

Closes 12/3/2026Opened 10/29/2026

City of Alhambra·California

61% match

N2M26-20 CITY HALL ENERGY MANAGEMENT SYSTEM HVAC CONTROLS RETROFIT AND UPGRADE

Closes 11/12/2026Opened 10/20/2026

City of Alhambra·California

61% match

N2M26-94 SEWER MAIN REPLACEMENT PROJECT ON SIERRA VISTA AVENUE

Closes 11/5/2026Opened 10/8/2026

City of Charlotte·North Carolina

60% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

LA Public Works Engineering Bureau·California

59% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

City of Alhambra·California

59% match

PROFFESIONAL ENGINEERIGN DESIGN SERVICES (PS&E) FOR FY26/27 RMRA STREETS REHABILITATION PROJ

Closes 11/19/2026Opened 9/21/2026

Northern Virginia Parks·Virginia

58% match

Addendum 2

Rolling / TBD closeOpened 10/28/2026

City of El Paso De Robles·California

58% match

Riverside Avenue Improvements from 17th to 21st Street

Closes 11/5/2026Opened 9/24/2026

City of Naples - Purchasing Division·Florida

58% match

27-001 Baker Park Addition and Restroom Improvements - ITB

Closes 12/1/2026Opened 10/16/2026

City of San Ramon·California

58% match

Alcosta Senior & Community Center Outdoor Handrail Replacement (CIP #955584)

Closes 12/3/2026Opened 10/29/2026

Cameron Parish Parks & Recreation District No 7·Louisiana

58% match

Advertisement For Bids for Proposed Recreation Area Improvements in Creole

Closes 11/6/2026Opened 9/24/2026

Town of Hilton Head Island·South Carolina

58% match

Crossings Park Improvements Phase 2-Skate Park and Pump Track

Closes 12/10/2026Opened 10/26/2026

City of Shawnee·Kansas

58% match

Ordinance No. 3494

Closes 7/16/2031Opened 7/16/2024

City of Charlotte·North Carolina

58% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Vernon·California

57% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Marco Island·Florida

57% match

ITB 2026-013 Winterberry & Maple Beach Access Beautification

Closes 11/19/2026Opened 10/18/2026

Texas City of San Antonio·Texas

57% match

Main Plaza Renovations

Closes 12/1/2026Opened 10/16/2026

Town of Arlington·Massachusetts

57% match

Oil Hydraulic Elevator Improvements - Police Headquarters

Closes 11/3/2026Opened 9/17/2026

Memphis-Shelby Airport Authority·Tennessee

57% match

DeWitt Spain Exterior Improvements

Closes 11/23/2026Opened 10/6/2026

Northern Virginia Parks·Virginia

57% match

Algonkian 2027 Golf Course Renovations Project Manual

Closes 11/12/2026Opened 10/8/2026

City of Mankato·Kansas

57% match

Mankato Airport (TKO) | 24434

Closes 11/19/2026Opened 10/31/2026

Port of Iberia District Board of Commissioners·Louisiana

57% match

Unifab Road Warehouse and Site Improvements, Building A Additional Improvements, (Phase VI of SPN H.015864)

Closes 11/17/2026Opened 10/23/2026

U.S. Department Of Transportation·Hawaii

57% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

57% match

Rockwood Hall Entrance at Rockwood Hall of Rockefeller State Park Preserve

Closes 11/19/2026Opened 10/15/2026