This contract calls for the demolition and removal of all structures on the parcel at 209 Lexington Avenue, Mobile, AL, including utilities disconnection, hazardous material handling, erosion control, and site restoration. The work must be completed within a short, defined period after the issuance of a Notice to Proceed, with penalties for delays, and includes mandatory documentation and insurance requirements.
• Wet demolition of existing structures, footings, slabs, and debris, with lead‑based paint and asbestos disposal.
• Utility disconnection (sanitary sewer, water, gas) and comprehensive erosion‑control BMP installation and daily inspection.
• Post‑demolition site stabilization (top‑soil, seeding, mulching) and final close‑out documentation, including photographs, waste‑shipment records, and newspaper notice of completion.