The contract is for the remanufacture of a Peerless Pump at the Cartee Water Treatment Plant. The pump is approximately 45 years old and needs to be rebuilt to maintain pressure in the distribution system. The contract was awarded to Tom Evans Environmental, which is the sole supplier for Peerless Pump products in the area. The scope of work includes picking up the pump, sending it to the Peerless factory for inspection and repair, and then returning it to the jobsite. The contract value is estimated to be $34,014.30.
• The contract is for a single award to Tom Evans Environmental.
• The contract duration is approximately 163 days.
• The contract includes the remanufacture of the Peerless Pump and the replacement of various parts.
• The contract includes non-witnessed factory testing and coating of the pump.
• The contract includes shipping and handling of the pump to and from the jobsite.