Awarded vendors
- Treichal Construction Inc., dba Warren Door
Description
The contract is for the furnishing and installation of a pit-mounted dock lift at the Shuman Juvenile Detention Center. The contractor, Treichal Construction Inc., dba Warren Door, will be responsible for providing and installing the lift. The contract period is from May 1, 2019, to September 30, 2019. The estimated cost of the contract is $11,800.00.
• The contract is for a specific project, furnishing and installing a pit-mounted dock lift.
• The contractor is responsible for providing and installing the lift.
• The contract period is from May 1, 2019, to September 30, 2019.
• The estimated cost of the contract is $11,800.00.