Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Accessible Curb Ramp Improvement Project 2021

Awarded contract·County of Sacramento - Construction·California

Accessible Curb Ramp Improvement Project 2021

Won by Central Valley Engineering and Asphalt +4 more$956kMultiple Award
Contract source

Awarded vendors

  • Central Valley Engineering and Asphalt
  • FBD Vanguard Construction, Inc.
  • Sierra National Construction Inc.
  • Lamon Construction Co. Inc.
  • B&M Builders, Inc.

Description

The Accessible Curb Ramp Improvement Project 2021 involves the removal and replacement of concrete curb, gutter, and/or sidewalk, construction of sidewalk curb ramps, and other work specified in the plans and specifications at various locations in Sacramento County. The estimated construction cost is $825,000, and a General Engineering Contractor license is required. The project has multiple bidders, including Central Valley Engineering and Asphalt, FBD Vanguard Construction, Inc., Sierra National Construction Inc., Lamon Construction Co. Inc., and B&M Builders, Inc. • The project includes removing and replacing concrete curb, gutter, and/or sidewalk • The project includes constructing sidewalk curb ramps • The project includes removing and replacing asphalt concrete pavement adjacent to replaced curb and gutter • The project has an estimated construction cost of $825,000 • A General Engineering Contractor license is required for the project

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
4509

Contract value

$956,012

The estimated construction cost of the project is $825,000. However, the total bid prices from the vendors range from $956,012 to $1,107,380. Therefore, the contract value is likely to be around $956,012, which is the lowest total bid price.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Virginia Department of Transportation·Virginia

Top match · 76%

B40_2027 ON CALL - ADA COMPLIANCE CURB RAMP IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

San Bernardino County·California

73% match

North San Bernardino ADA Ramps

Closes 11/19/2026Opened 10/21/2026

City of Cerritos·California

73% match

CDBG-Funded curb ramp/sidewalk repairs at Cerritos Towne Center Phase IV (CDBG Project No. 602800-26), Project No. 24302

Closes 11/18/2026Opened 10/23/2026

California Department of Transportation·California

72% match

ADA curb ramps, high tension cable barrier, and LED lighting.

Closes 11/5/2026Opened 9/21/2026

City of Richmond Government·Virginia

71% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Maryland Baltimore City Department of Transportation·Maryland

71% match

TR-27006 CURB REPAIR CITYWIDE

Closes 11/18/2026Opened 10/24/2026

California Department of Transportation·California

71% match

Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting.

Closes 11/17/2026Opened 9/28/2026

Carroll County·Maryland

71% match

Eldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/22/2026

Town of Westwood·Massachusetts

70% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

U.S. Department Of Transportation·Hawaii

70% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

NYS East Fishkill, Town of·New York

70% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Maryland State Highway Administration·Maryland

70% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

City of Helena·Montana

69% match

6th Ward ADA Ramps Project

Rolling / TBD closeOpened 3/11/2026

Maryland State Highway Administration·Maryland

69% match

AL5105179 - MD 736 (Braddock Road) from Park Avenue to Braddock Street Sidewalks

Closes 12/3/2026Opened 10/27/2026

Illinois Tollway·Illinois

69% match

I-26-2059 - Plaza Improvements

Closes 11/13/2026Opened 10/3/2026

City of Richmond Government·Virginia

69% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Pasadena·California

69% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

69% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT

Closes 11/17/2026Opened 10/14/2026

City of Portland·Maine

69% match

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

City of Dayton·Ohio

69% match

Patterson Boulevard Rehabilitation

Closes 11/12/2026Opened 10/29/2026

California Department of Transportation·California

69% match

Const SW,curb ramps,Pvmt,install & Mod Elect systems,drainage systems.

Closes 12/16/2026Opened 10/26/2026

New York City Department of Design and Construction·New York

69% match

HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

The City of Anaheim·California

69% match

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

City of Fresno·California

69% match

Chestnut Neighborhood Sidewalks

Closes 11/17/2026Opened 10/16/2026

San Bernardino County·California

69% match

Randall Avenue Sidewalk

Closes 12/3/2026Opened 10/27/2026