This contract concerns the replacement of the Meeting House Branch sewer line and associated infrastructure in Delaware. The awardee, Teal Construction, will perform a suite of civil‑engineering tasks including pipe installation, manhole construction, tree removal, erosion control, traffic management, and CCTV inspection. The bid tabulation provides a detailed line‑item cost breakdown, indicating a total awarded value near $370 k.
• Scope includes installation of 8‑in. SDR35 PVC, 15‑in. SDR26 PVC, and two 4‑ft diameter manholes.
• Ancillary work covers tree removal/replacement, site restoration, de‑watering, backfill, and stone bedding.
• The procurement was a competitive Invitation to Bid with at least two bidders; Teal Construction emerged as the lowest‑priced awardee.