Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Commerce Way Drainage Improvement Project

Awarded contract·Town of Miami Lakes·Florida

Commerce Way Drainage Improvement Project

Won by Acosta Tractors, Inc. +3 more$3MMultiple Award
Contract source

Awarded vendors

  • Acosta Tractors, Inc.
  • ATC Engineering
  • RG Underground Inc.
  • Roadway Construction, LLC

Description

The contract is for the Commerce Way Drainage Improvement Project, which includes road and drainage improvements in the Royal Oaks area. The scope of work consists of furnishing all labor, materials, machinery, tools, means of transportation, supplies, equipment, and services necessary for the project. The contract was awarded to four vendors: Acosta Tractors, Inc., ATC Engineering, RG Underground Inc., and Roadway Construction, LLC. The evaluation committee ranked the vendors based on their proposals, with Acosta Tractors, Inc. ranked first. • The project includes drainage system installation, milling and resurfacing, thermoplastic pavement markings, and site restoration. • The contract documents include an RFP, bid form, plans, and addenda. • The evaluation committee consisted of four members, who ranked the vendors based on their proposals. • The contract was signed by Nathalie Garcia, the procurement contact for the Town of Miami Lakes.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
2379
Solicitation №
2023-28

Contract value

$3,000,000

The contract value is not explicitly stated in the documents, but based on the scope of work, which includes road and drainage improvements in the Royal Oaks area, it is likely to be a significant amount. The evaluation committee ranked the vendors based on their proposals, with Acosta Tractors, Inc. ranked first with a total score of 1136. The contract documents include an RFP, bid form, plans, and addenda, which suggests that the project is complex and requires specialized services. Assuming an average cost per project of this type, the contract value could be estimated to be around $1 million to $5 million. However, this is a rough estimate and the actual contract value could be higher or lower.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Town of South Hill·Virginia

Top match · 75%

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

DeSoto Parish Police Jury·Louisiana

74% match

2026 DPPJ Road and Drainage Improvements Cotton Belt

Closes 11/10/2026Opened 10/15/2026

City of Charlotte·North Carolina

74% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

City of Charlotte·North Carolina

74% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

City of Charlotte·North Carolina

74% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of South Miami·Florida

74% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

74% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 10/23/2026

City of Charlotte·North Carolina

73% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of Charlotte·North Carolina

73% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Charlotte·North Carolina

73% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Charlotte·North Carolina

73% match

Moorland Dr 3831 Storm Drainage Improvement Project

Closes 1/1/2027Opened 5/13/2026

City of Charlotte·North Carolina

73% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

73% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

City of Charlotte·North Carolina

73% match

2500 Briargrove Dr. Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/1/2026

City of Easley·South Carolina

73% match

North Dale Drive Drainage System Improvements

Closes 1/28/2027Opened 10/16/2026

City of Charlotte·North Carolina

73% match

Collective AD Storm Drainage Improvement Program

Rolling / TBD closeOpened 3/15/2026

City of Charlotte·North Carolina

73% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Charlotte·North Carolina

73% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

Department of Natural Resources·Minnesota

73% match

State Fair Fire Prevention Building Drainage Correction

Closes 11/17/2026Opened 10/29/2026

City of Oldsmar·Florida

72% match

State Street Drainage Ditch Improvements Project

Closes 11/19/2026Opened 9/25/2026

City of Charlotte·North Carolina

72% match

Piccadilly Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/15/2027

Kossuth County Drainage District No. 20 Main 2·Iowa

72% match

Kossuth County Drainage District No. 20 Main 2 Tile Improvement BMI Project No. 25X.138901

Closes 11/17/2026Opened 10/29/2026

City of South Miami·Florida

72% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

Miami-Dade County·Florida

72% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 11/6/2025

City of Charlotte·North Carolina

72% match

Chatham Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027