The contract is for traffic signal system retiming on Spring Hill Dr. (Waterfall Dr. to Commercial Way). The scope of work includes field reviews, system optimization, and draft reporting. The contract has a not-to-exceed total lump sum cost. The vendor, HDR Inc., will provide engineering services, including professional engineer services, project engineer services, and senior engineer services. The contract duration is approximately 9 months, from September 2023 to June 2024. Key points to consider:
• The contract is for a specific project with a defined scope of work
• The vendor will provide various engineering services
• The contract has a not-to-exceed total lump sum cost
• The contract duration is approximately 9 months