This contract calls for the complete asbestos‑containing exterior siding removal and “wet” demolition of 45 residential buildings at the Woodlawn Apartments site in Mobile, Alabama. The contractor must handle hazardous waste disposal, utility disconnection, site grading, erosion control, and post‑demolition landscaping, complying with EPA, ADEM, and City regulations, and must meet a 90‑day completion window after receipt of a Notice to Proceed. The award went to CHRIS BREWER CONTRACTING, INC., following an open competitive bidding process.
• Scope: Asbestos abatement, full demolition (foundations, footings, slabs), utility capping, hazardous waste disposal, site restoration.
• Requirements: Alabama General Contractor license (BC or D), bid bond ≤ $10,000, performance & labor‑and‑material bonds, E‑Verify enrollment, 15 % DBE participation, insurance, and compliance with environmental and safety regulations.
• Timeline: Pre‑bid conference – Aug 4 2021; bid deadline – Aug 11 2021; award decision within 60 days; 90‑day performance period after NTP; $250/day liquidated damages for delays.