The contract is for the installation of a new electrical power distribution system and ventilation system at Well No. 9. The existing systems were installed nearly 30 years ago and are at the end of their useful life. The contract was awarded through a competitive bidding process, with the lowest bidder being selected. The bid results show that Kilowat Electric was the lowest bidder, with a base bid of $118,000.00.
• The contract is for electrical improvements at Well No. 9.
• The existing systems are at the end of their useful life.
• The contract was awarded through a competitive bidding process.
• The lowest bidder was Kilowat Electric, with a base bid of $118,000.00.