This solicitation seeks a comprehensive flood‑mitigation and storage channel improvement project for “Area 7” and the “Hollidal Channel” within the City of Waukesha, Wisconsin. The work includes extensive site preparation, demolition of existing structures, excavation, installation of storm‑sewer pipes and manholes, construction of concrete‑lined channels, placement of rip‑rap and cellular confinement systems, curb‑and‑gutter replacement, pavement resurfacing, and ecological restoration (topsoil, seed, erosion control). Four contractors submitted sealed bids, with total bid amounts ranging from roughly $1.94 million to $3.20 million. The bid opening is scheduled for March 14, 2025 at 11:00 AM CDT, indicating that the procurement is in the bid‑opening phase and no award has yet been made.
• Scope covers civil‑engineering construction tasks such as pipe and manhole installation, channel lining, heavy earthwork, and erosion‑control measures.
• Multi‑million‑dollar project (estimated contract value ≈ $2.5 M based on submitted bids).
• Open, sealed‑bid competition with at least four qualified contractors participating.