The contract is for concrete sidewalk repair and tree removal at the District's Electric building in Everett, Washington. The contractor will be responsible for demolishing, removing, and replacing existing damaged sidewalk sections, one curb and gutter section, and one ADA ramp. The project also includes the removal of existing street trees, tree stumps, roots, and tree grate material. The engineer's estimate for the project is $156,000.00, but the contract was awarded to NPM Construction Co. for $86,333.00, plus tax.
• The contract requires the contractor to provide all labor, materials, equipment, tools, and expertise necessary for the project.
• The contractor must be currently on the District's Small Works Roster category "Concrete Construction" prior to bidding.
• The contract was awarded through a competitive bidding process, with NPM Construction Co. being the apparent responsible low bidder.
• The project is located at the District's Electric building in Everett, Washington, in Snohomish County.
• The contract includes the removal of existing street trees, tree stumps, roots, and tree grate material.
• The contractor is responsible for ensuring that all work is completed in accordance with the contract documents and specifications.