This contract calls for the rapid, wet demolition and complete site clearing of a structure located at 1205 Belle Cour Drive E., Mobile, AL. The City of Mobile’s Municipal Enforcement Department requires the contractor to perform demolition, utility capping, erosion‑control BMP installation, hazardous‑material handling, and final site stabilization within a tight 15‑day window after notice to proceed. The work must comply with federal lead‑based paint and asbestos regulations, and the contractor must provide proof of E‑Verify enrollment, insurance, and a current business license. The award went to AA&A DEMOLITION.
• Wet demolition of the building, footings, slabs, and related debris.
• Utility disconnection and capping (sewer, water, gas) with notification to the city.
• Installation of temporary and permanent erosion‑control BMPs, followed by seeding/mulching.
• Compliance with lead‑paint, asbestos, and NESHAP requirements, including waste‑shipment documentation.
• Mandatory post‑completion documentation, final newspaper notice, and a $250/day liquidated‑damage penalty for late finish.