Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Waste Removal and Collection
  5. ›Spring Hill Water Reclamation Facility - Phase I…

Awarded contract·Hernando County Board of County Commissioners·Florida

Spring Hill Water Reclamation Facility - Phase I Environmental Assessment

Won by WSP USA, Inc.$2MSingle Award
Contract source

Awarded vendors

  • WSP USA, Inc.

Description

This contract is for hydrogeologic and environmental management services for the Hernando County Utilities Department. The scope of work includes hydrologic data monitoring and analysis, utilities and infrastructure design, scientific investigation, analysis, and technical studies, environmental monitoring and management, and other related services. The contract has a lump sum payment structure, and the vendor is required to provide professional liability insurance and comply with all federal, state, and local laws and ordinances applicable to the work. The contract also includes provisions for termination, dispute resolution, and auditing. • Hydrologic data monitoring and analysis • Utilities and infrastructure design • Scientific investigation, analysis, and technical studies • Environmental monitoring and management • Environmental monitoring plans • Oversight and implementation of an Environmental Management Plan (EMP) • Water supply planning and permitting • Water source assessments • Environmental assessments • Well/wellfield siting, design, and construction management • Wellhead modeling and protection activities • Well testing and rehabilitation • Private well complaint investigation and resolution • Groundwater modeling • Groundwater monitoring plans • Sinkhole investigations • Development of hydrologic, geologic, hydrogeologic models, cross-sections, and evaluations • Design and operation of groundwater contamination remediation systems • Preparation of plans, specifications, and reports • Cost estimating and scheduling • Permit preparation and regulatory compliance issues • Water quality monitoring • Minimum flows monitoring • Required survey and administration services • Ecological services related to the EMP for all monitoring sites

Attached files

Key dates

Starts
8/20/2024
Ends
6/3/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Utilities and Waste Management
NAICS
541330
Solicitation №
22-R00070/PH TO6

Contract value

$2,000,000

The contract value is not explicitly stated in the document. However, based on the scope of work and the hourly labor rates provided in Exhibit B, we can estimate the contract value. The hourly rates range from $60 to $240 per hour, and the contract duration is not specified. Assuming an average hourly rate of $150 and a contract duration of 12 months, the estimated contract value would be around $1.5 million to $2.5 million, depending on the number of hours worked. However, this is a rough estimate and the actual contract value may be higher or lower.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Town of Eatonville·Florida

Top match · 71%

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

U.S. Department Of Defense·Minnesota

70% match

Phase I Environmental Site Assessment at Lower Grey Cloud Slough Islands

Closes 11/11/2026Opened 10/29/2026

NYS Greenburgh, Town of·New York

69% match

Lead Service Lines Identification Project - Phase I

Closes 12/1/2026Opened 10/28/2026

Maryland Mayor and Town Council of Oakland·Maryland

68% match

PROFESSIONAL ENGINEERING SERVICES OAKLAND WATER SYSTEM COMPREHENSIVE ENGINEERING & INFRASTRUCTURE PLAN, PHASE I

Closes 11/9/2026Opened 10/9/2026

City of Ontario·California

67% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

City of Waco·Texas

66% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

City of Salisbury·Maryland

66% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

Texas City of Waco·Texas

66% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

City of Seal Beach·California

66% match

San Gabriel River Trash Interceptor Pilot Project - Environmental Review / Permitting Support Services (CIP SD2501)

Closes 11/10/2026Opened 10/6/2026

Jackson County Utility Authority·Mississippi

66% match

WJC Process Improvements Phase 1

Closes 12/8/2026Opened 8/16/2026

Citrus County - Board of County Commissioners·Florida

66% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

City of Natchitoches·Louisiana

66% match

NATCHITOCHES PUBLIC SWIMMING POOL PROJECT PHASE 1

Closes 12/1/2026Opened 10/29/2026

U.S. Bureau of Reclamation·United States of America

65% match

Title XVI Water Reclamation and Reuse Projects

Closes 8/26/2027Opened 5/14/2026

City of South Lake Tahoe·California

65% match

Drainage Master Plan Update & Areawide Facility Analyses

Closes 11/17/2026Opened 10/1/2026

County of Westchester·New York

65% match

REQUEST FOR PROPOSAL : Hydrogeologic Sampling and Reporting Services at Sprout Brook Landfill

Closes 11/9/2026Opened 10/21/2026

Western Virginia Water Authority·Virginia

65% match

ITB - SPRING HOLLOW WTF CLEARWELL

Closes 11/17/2026Opened 10/15/2026

Beaufort - Jasper Water & Sewer Authority·South Carolina

65% match

Great Swamp Wetlands Monitoring Services

Closes 11/19/2026Opened 10/9/2026

NYS Ontario County·New York

65% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/16/2026

Connecticut Town of Old Saybrook·Connecticut

65% match

Water Pollution Control Authority Environmental Studies

Closes 11/23/2026Opened 10/26/2026

Colton Municipal Utility District No. 1·Texas

65% match

Mass Grading and Detention Facilities to Serve Colton Detention Pond A Phase 1

Closes 11/5/2026Opened 10/20/2026

Greenbrier County Commission·West Virginia

65% match

Lewis Spring Project

Rolling / TBD closeOpened 10/22/2026

City of Charlotte·North Carolina

64% match

University Pond Water Quality Enhancement Project

Rolling / TBD closeOpened 5/14/2026

Maryland Wicomico County Government·Maryland

64% match

Fruitland Sewer Extension Preliminary Engineering Report

Closes 12/2/2026Opened 10/15/2026

City of Waco·Texas

64% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026