23/0224 - Construction of Trail including Pedestrian Bridge along Fairmont Parkway between HCFCD B100-00-00 (Armand Bayou) and Red Bluff Road for Harris County Precinct 2
Won by Ballast Point Construction$2.1MSingle Award
The contract is for the construction of a 10' wide trail along Fairmont Parkway from Armand Bayou Hike and Bike Trailhead to Red Bluff Drive, including a pedestrian bridge at Armand Bayou. The project aims to improve park and neighborhood pedestrian and bicycle connectivity. The contract was awarded to Ballast Point Construction for $2,055,139. Key aspects of the project include the construction of the trail, pedestrian bridge, and associated infrastructure, such as audio pedestrian signals, crosswalks, and ramps at signalized intersections.
• The project includes the construction of a 10' wide trail along Fairmont Parkway.
• A pedestrian bridge will be built at Armand Bayou.
• The project aims to improve park and neighborhood pedestrian and bicycle connectivity.
• The contract was awarded to Ballast Point Construction for $2,055,139.
• The project includes the construction of associated infrastructure, such as audio pedestrian signals, crosswalks, and ramps at signalized intersections.