The contract is for the replacement of two existing electrical generators at the Eric Rood Administrative Center with one new customer-provided 500kw Kohler diesel generator and ATS. The scope of work includes site work, trenching, concrete foundation, conduits, wire, and generator installation according to the plans and specifications. The contractor must possess a C-10 electrical contractor's license and have at least 5 years of experience installing 500kw generators or larger. The engineer's estimate for the project is $185,000.
• The project requires a pre-bid conference and a bid bond.
• The contractor must comply with the specifications, terms, and conditions of the bid.
• The award of the bid will be based on the verified results, not the initial reading of the bids.
• The project is located at 950 Maidu Ave, Nevada City, CA 95959.