Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Water and Wastewater
  5. ›Fuller Creek Phase F, Pump Station Installation

Awarded contract·Four Rivers Sanitation Authority·Illinois

Fuller Creek Phase F, Pump Station Installation

Won by Kelsey Excavating, Inc.$1MSingle Award
Contract source

Awarded vendors

  • Kelsey Excavating, Inc.

Description

This contract is for the design‑build construction of a new duplex submersible pump station (Fuller Creek Phase F) and associated civil, mechanical, and electrical works for the Rock River Water Reclamation District in Rockford, Illinois. The scope includes demolition of the existing facilities, installation of temporary utilities, excavation and rock removal, construction of a valve vault, installation of sanitary sewer and force‑main piping, building renovations, a full electrical system with a standby 100 kW diesel generator, and site restoration/seeded landscaping. The award is a lump‑sum, firm‑fixed‑price contract awarded to Kelsey Excavating, Inc., with a required completion date of 31 January 2019 and liquidated damages of $300 per day for overruns. The project is funded by an Illinois EPA revolving‑loan and follows state water‑sewer, I.E.P.A., and safety standards. • Full pump‑station installation (duplex submersible pumps, VFDs, control equipment) • Comprehensive civil works (demolition, excavation, temporary pavement, sewer & force‑main installation) • Electrical & standby power system (new conduit, generators, arc‑flash study) • Project must start within one day of the Notice‑to‑Proceed and be finished by 31 Jan 2019, with a 2‑hour maximum cut‑over outage.

Attached files

Key dates

Bids closed
4/23/2018
Ends
1/31/2019
Duration
9 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237120
Solicitation №
18-403

Contract value

$1,000,000

The bid tab lists a grand total of $992,097.38 for the engineered estimate, and the contract is a lump‑sum award. Public‑works pump‑station projects of this size in Illinois typically fall in the $0.9–1.2 M range. Considering contingencies, inflation, and possible change‑order allowances, a reasonable ballpark value for the awarded contract is roughly $1 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Johnson County Wastewater·Kansas

Top match · 67%

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

City of Camden·South Carolina

66% match

Cool Springs Pump Station Replacement

Closes 11/18/2026Opened 10/19/2026

City of San Diego·California

66% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of Hilliard, Ohio·Ohio

65% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

Gwinnett County Government·Georgia

65% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

City of Waco·Texas

64% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

City of Cincinnati·Ohio

64% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/5/2026Opened 9/17/2026

City of Fresno·California

64% match

Wellhead Treatment Improvements at Pump Station 102A

Closes 11/17/2026Opened 10/20/2026

Massachusetts Town of Marion·Massachusetts

64% match

Creek Road Pump Station Resiliency Improvements

Closes 12/2/2026Opened 10/21/2026

City of Cincinnati·Ohio

64% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/12/2026Opened 9/17/2026

City of Waynesboro·Virginia

64% match

Shenandoah Village Drive Pump Station Replacement and System Improvements Contract I

Closes 11/10/2026Opened 9/30/2026

U.P. Engineers & Architects, Inc·Michigan

64% match

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

City of Key West·Florida

64% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

Charles County Government·Maryland

64% match

Cobb Island and Hill Road Pump Station Improvements (UN 1308\UN 1309)

Closes 11/4/2026Opened 9/24/2026

Miami‑Dade County Water & Sewer Department·Florida

64% match

Pump Station 0812 Relocation and Upgrade

Closes 12/1/2026Opened 10/16/2026

City of Charlotte·North Carolina

63% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

Dickenson County·Virginia

63% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

City of Stillwater·Oklahoma

63% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

The Metropolitan Water District of Southern California·California

63% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

Jackson County Utility Authority·Mississippi

63% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

Town of Eatonville·Florida

63% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Massachusetts Town of Nantucket·Massachusetts

63% match

IFB - Well No. 17 Pump Station Project

Closes 12/9/2026Opened 10/28/2026

City of Cincinnati·Ohio

63% match

Camargo Canyon Pump Station Elimination (10270026)

Closes 11/10/2026Opened 10/8/2026

Miami-Dade County·Florida

63% match

Pump Station 0812 Relocation and Upgrade

Closes 12/1/2026Opened 10/16/2026

City of South San Francisco·California

63% match

Oyster Point Sanitary Sewer Pump Station Relocation

Closes 11/12/2026Opened 10/1/2026