This contract concerns the realignment of a municipal sewer main along Rogers Avenue (from Waldron to 56th St.) in Fort Smith, Arkansas. The scope includes extensive civil‑construction tasks such as trenching, back‑filling, installation of 18‑inch sewer pipe (PVC, ductile‑iron, and HDPE), construction and rehabilitation of manholes, concrete work, sidewalk and curb repair, flowable fill placement, and associated surface‑improvement and traffic‑control activities. The bid tabulation shows a total base bid of roughly $1.32 million, with an additional 5 % local‑resident preference applied. No award decision is disclosed, and Goodwin & Goodwin, Inc. was deemed non‑responsive.
• Sewer‑main trenching and pipe installation (multiple materials)
• Manhole construction, caps, and abandonment of existing structures
• Site preparation, backfill, flowable fill, and surface‑paving work