The 2025 Sewer Lateral Lining Project involves the cured-in-place lining of fifty (50) sewer laterals, ranging from 4" to 6" in size. The project was awarded to Greenberg Clark Inc. DBA The Trenchless Co. with a base bid of $189,350.00. The bid was opened on April 8th, 2025, at 2:00 p.m. The key aspects of this project include the lining of sewer laterals, which is a critical component of maintaining and upgrading the city's infrastructure. The project's scope of work and requirements are outlined in the bid specifications document.
• The project involves the lining of 50 sewer laterals.
• The sewer laterals range from 4" to 6" in size.
• The project was awarded to Greenberg Clark Inc. DBA The Trenchless Co.
• The base bid for the project was $189,350.00.
• The bid was opened on April 8th, 2025, at 2:00 p.m.