This contract calls for the milling and asphalt overlay of approximately 21 lane‑miles of streets and 72,500 square yards of alleys throughout Denver. The work includes removal of existing asphalt, hot‑mix asphalt (HBP) patching and type‑grading, installation of signage and pavement markings, and provision of temporary traffic control. The project is funded at an estimated construction cost between $3.8 M and $4.2 M, with the final awarded bid totaling $2,806,952.49 to LOYA Construction, Inc. The solicitation required pre‑qualification at the $6 M level for Category 1F(1) Asphalt work and included a 16 % MWBE participation goal. Bids were submitted and opened via the Rocky Mountain E‑Purchasing (BidNet) system, with virtual pre‑bid and bid‑opening meetings held on Microsoft Teams.
• Mill and overlay of 21 lane‑miles of local, collector, and arterial streets.
• Removal of 150 k SY of street asphalt and 70 k SY of alley asphalt, plus HBP patching and type‑grading.
• Additional scope: sign & marker installation, pavement markings, and traffic‑control services.
• Required pre‑qualification ($6 M) and MWBE 16 % participation; awarded to LOYA Construction, Inc. for $2.81 M.