This contract is for the restoration of the track at Hummer Sports Park, which includes a full thickness restoration re-top of a synthetic track system. The project requires the reconditioning of the surface of the entire track oval, chutes, and D-areas, as well as associated field events. The contract was issued by Topeka Public Schools, and the bid was closed on June 26, 2017. The scope of work includes furnishing and installing the track system in accordance with all codes and authorities having jurisdiction.
• The contract requires a full thickness restoration re-top of a synthetic track system.
• The project includes reconditioning of the surface of the entire track oval, chutes, and D-areas.
• The contract was issued by Topeka Public Schools.
• The bid was closed on June 26, 2017.
• The scope of work includes furnishing and installing the track system in accordance with all codes and authorities having jurisdiction.