Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›STORM DIG AND REPAIR 2019 - PHASE 2 (Site 8)

Awarded contract·City of Bellevue (WA)·Washington

STORM DIG AND REPAIR 2019 - PHASE 2 (Site 8)

Won by Laser Underground & Earthworks, Inc.$64kSingle Award
Contract source

Awarded vendors

  • Laser Underground & Earthworks, Inc.

Description

The contract is for the replacement of existing storm drainage pipe, including the replacement of a water quality facility, curb, gutter, and sidewalk replacement, and restoration of the existing irrigation system. The contract was awarded to Laser Underground & Earthworks, Inc. The key aspects of the contract include: • Replacement of existing storm drainage pipe • Replacement of a water quality facility • Curb, gutter, and sidewalk replacement • Restoration of the existing irrigation system The contract involves various items such as mobilization, pothole utility crossing, traffic control, trench/excavation protection, water pollution/erosion control, stormwater bypass, cement concrete curb and gutter, cement concrete sidewalk, crushed rock, storm drain pipe, and more.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
19106

Contract value

$63,525

Based on the bid tabulation, the total contract value is approximately $63,525.00, as bid by Laser Underground & Earthworks, Inc. This value is estimated based on the unit prices and quantities listed in the bid tabulation. The total contract value may vary depending on the actual quantities and unit prices.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

County of Santa Cruz·California

Top match · 71%

Upper East Zayante PM 1.18 Storm Damage Repair Project

Closes 11/12/2026Opened 10/15/2026

City of Hesperia·California

70% match

2025 DECEMBER ADVERSE WEATHER EMERGENCY REPAIRS: CEDAR STREET AND BANDICOOT TRAIL

Closes 11/12/2026Opened 9/23/2026

City of Shawnee·Kansas

70% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

County of Santa Cruz·California

69% match

Eureka Canyon Road PM 8.11 and 8.39 Storm Damage Repair Projects

Closes 11/5/2026Opened 10/8/2026

U.S. Department Of Defense·Missouri

69% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

The University of North Carolina·North Carolina

69% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

City of Newton·Massachusetts

69% match

On-Call Utility Excavation & Repairs

Closes 11/12/2026Opened 8/31/2023

City of Pawtucket·Rhode Island

69% match

Addendum No. 1 to RFP 27-008

Closes 1/14/2027Opened 7/21/2026

Massachusetts Town of Westborough·Massachusetts

69% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Lake Oswego·Oregon

68% match

Ash Street and Lund Street – Storm System Improvements Project

Closes 11/5/2026Opened 9/29/2026

County of Santa Cruz·California

68% match

SOQUEL SAN JOSE RD PM 5.55 STORM DAMAGE REPAIR PROJECT, FEDERAL PROJECT No. ER-15J2 (004)

Closes 11/5/2026Opened 10/8/2026

Greenville County·South Carolina

68% match

CLASS 2 LANDFILL PARTIAL CLOSURE

Closes 11/16/2026Opened 10/23/2026

Town of Medfield·Massachusetts

68% match

MSH Roadway & Infrastructure Improvements (Phase 2)

Closes 11/19/2026Opened 10/28/2026

Lucas County Engineer·Ohio

68% match

2026 Springfield Township O.P.W.C. Road Improvement Project, Phase 2

Closes 11/10/2026Opened 10/26/2026

Maryland Saint Mary's County Metropolitan Commission·Maryland

68% match

Piney Point/St. George’s Island Force Main Replacement Phase 1, Project 5171MS

Closes 12/1/2026Opened 10/28/2026

City of Pawtucket·Rhode Island

68% match

27-008 Tidewater Landing Phase 1 B Riverwalk East Contract 2 – Early Site Work

Closes 11/12/2026Opened 10/15/2026

Delaware Solid Waste Authority·Delaware

68% match

CHERRY ISLAND LANDFILL (CIL) AND PIGEON POINT LANDFILL (PPLF) MANHOLE REHABILITATION – PHASE 2

Closes 12/15/2026Opened 10/29/2026

Municipality of Anchorage·Alaska

68% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

City of Ankeny·Iowa

68% match

Westlawn Place Area Utility Improvements - Phase 2A

Closes 11/10/2026Opened 10/21/2026

Town of Church Point·Louisiana

68% match

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

Park County Public Works·Wyoming

68% match

Willwood Road Improvements Project- Phase 2 Culverts

Closes 11/16/2026Opened 10/16/2026

County of Santa Cruz·California

68% match

HIGHLAND WAY PM 5.60 AND 5.80 STORM DAMAGE REPAIR PROJECTS, FEDERAL PROJECT No. ER-15J2 (005 & 006)

Closes 11/5/2026Opened 10/8/2026

City of Mason·Ohio

68% match

Snider Road Widening Project - Phase 2

Closes 11/17/2026Opened 10/19/2026

City of Lebanon·Indiana

68% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026