The Monarch Grove Elementary School Recycled Water Conversion project aims to increase the resiliency and sustainability of the groundwater basin at the school. The project involves the installation of a new 3-inch PVC line, a new 3-inch RW meter assembly and vault, and other related work. The contract was awarded to RCH Construction and Hartzell General Engineering Contractor, Inc. The engineer's estimate for the project is $335,297.00.
• The project includes the installation of a new 3-inch PVC line from the new RW meter to the existing irrigation system.
• The project includes the installation of a new 3-inch RW meter assembly and vault.
• The project includes the installation of new control wires and the removal of existing control wires.
• The project includes the installation of a new 3-inch swivel-ell assembly.
• The project includes the installation of a new 3-inch RP assembly on the potable water system.