Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Hampshire guideNew Hampshire Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Hampshire
  4. ›Water and Wastewater
  5. ›Emerald Drive Water Main Upgrade 2024

Awarded contract·Town of Derry·New Hampshire

Emerald Drive Water Main Upgrade 2024

Won by American Excavating$500kSingle Award
Contract source

Awarded vendors

  • American Excavating

Description

This sealed‑bid solicitation calls for the replacement and installation of a new water‑main system along Emerald Drive in Derry, NH. The scope includes installing 2,080 linear feet of water main and 740 linear feet of drainage, requiring excavation, pipe placement, backfilling, and testing. Bids were required to be submitted to the Public Works Office by 10:00 AM on July 3 2024, with the contract ultimately awarded to American Excavating. The project is a municipal infrastructure upgrade focused on water distribution and storm‑water management, typical of small‑to‑medium civil‑construction work. • 2,080 ft water main installation • 740 ft drainage installation • Sealed‑bid, full‑open competition; award to a single contractor (American Excavating) • Work location: Emerald Drive, Derry, NH; bid documents held at the Derry Municipal Center.

Attached files

Key dates

Bids closed
7/3/2024

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110

Contract value

$500,000

The contract does not disclose a dollar figure, so an estimate is required. Typical municipal water‑main installation costs range from $120–$180 per linear foot for the pipe, plus labor, backfill, and testing. Assuming a mid‑range $150/ft for the 2,080 ft water main yields $312,000. Drainage work often costs $180–$220 per linear foot; using $200/ft for the 740 ft drainage gives $148,000. Adding design, mobilization, and contingency (≈ 15 % of subtotal) brings the total to roughly $460,000 + $70,000 ≈ $530,000. Rounding to a conservative ballpark, the contract value is estimated at about $500,000. Factors influencing this estimate include local labor rates, pipe material specifications, and any required traffic control or environmental mitigation.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of DeLand·Florida

Top match · 71%

2024 Downtown South Water Main Improvements-East Phase

Closes 11/17/2026Opened 10/13/2026

City of Ontario·California

69% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Bellevue·Washington

69% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Massachusetts Convention Center Authority·Massachusetts

69% match

V04 - Lawn on D Utilities Upgrades

Closes 11/12/2026Opened 10/14/2026

Hastings Utilities·Nebraska

69% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

Gwinnett County Government·Georgia

69% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/22/2026

City of DeLand·Florida

69% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

Riverton City·Utah

68% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

Clermont County - Board of Commissioners·Ohio

68% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

City of Conway·South Carolina

67% match

Highway 905 Water Line Upgrade

Closes 12/3/2026Opened 10/30/2026

City of Edgewater, FL·Florida

67% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

Gwinnett County Government·Georgia

67% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

Western Virginia Water Authority·Virginia

67% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

City of Waukegan·Illinois

67% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026

City of Charlotte·North Carolina

67% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

Massachusetts Dracut Water Supply District·Massachusetts

67% match

Well 4 Replacement Project

Closes 11/12/2026Opened 10/14/2026

Oregon Tualatin Valley Water District·Oregon

67% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

Northern Kentucky Water District·Kentucky

67% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

Georgia Gwinnett County·Georgia

67% match

BL131-26, Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

Goodwyn Mills Cawood·Alabama

67% match

Geno Road Water Main Replacement for the Orange Beach Water Authority

Closes 11/19/2026Opened 10/20/2026

Northern Kentucky Water District·Kentucky

66% match

Amsterdam Road Water Main Replacement

Closes 11/5/2026Opened 10/16/2026

Riverton City·Utah

66% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

City of Grand Rapids Department of Engineering·Michigan

66% match

Water Main and Water Main Lining, Adams Street – City of Grand Rapids

Closes 11/3/2026Opened 10/15/2026

Gwinnett County Government·Georgia

66% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/27/2026

Florida Governmental Utility Authority·Florida

66% match

Meadow Road and 28th St. Water Main Extension

Closes 11/24/2026Opened 10/19/2026