This contract awards a small‑works, lump‑sum painting job for the exterior stairwell of the Snohomish County Jail. The work involves sand‑blasting (brush‑off blast cleaning) followed by a full exterior repaint of the east stairwell located in the loading‑dock area. Two firms bid, with Pro Paints, LLC selected as the lowest responsive bidder at a base price of $70,000, with optional/total amounts up to $139,401. The procurement was conducted through an open competition under the county’s purchasing services, and a 5 % bid bond (check acceptable) was required.
• Scope: Paint only the east exterior stairwell of the County Jail, including required sand‑blasting.
• Award: Pro Paints, LLC (single‑award, lump‑sum contract).
• Value: Base award $70,000 (options up to $139,401).
• Procurement: Small‑works, full and open competition; bid deadline 18 Jun 2024, award 22 Jul 2024.