The contract is for the replacement of four 500 HP 480V variable speed drives and the installation of a new 900 HP variable speed drive at the FSU Magnet Lab. The work will take place during an 8-week operational shutdown. The contractor must supply sufficient staff to complete the installation during this period. The key points of the contract include:
• Replacement of four 500 HP 480V variable speed drives
• Installation of a new 900 HP variable speed drive
• Work to be completed during an 8-week operational shutdown
• Contractor must supply sufficient staff to complete the installation
• The contract was awarded to Metro Power with a total bid of $182,712.00.