This contract is for the provision of professional engineering services to provide Total Maximum Daily Loads (TMDLs) for selected impaired streams in the Cacapon River Watershed. The contract includes a change order to extend the contract period by one year, with no additional cost. The contractor will be responsible for preparing responses to public comments and making necessary revisions to the TMDL deliverables to gain approval by the EPA. Key aspects of the contract include:
• The contract is for a period of 3 years
• The total contract cost is $338,603.00
• The contractor is Tetra Tech, Inc.
• The point-of-contact for the contract is Joseph (Josh) E Hager III
• The contract includes a change order to extend the contract period by one year