This contract calls for the full demolition and site‑clearing of existing structures at 910 Montgomery Street, Mobile, AL, using wet‑method techniques to control dust and hazardous material release. The contractor must remove foundations, cap utilities, manage lead‑based paint and asbestos, install and maintain erosion‑control BMPs, and complete post‑demolition seeding and landscaping. All work must be finished within 15 calendar days of the Notice to Proceed, with liquidated‑damage penalties for delays. The awardee also must provide extensive documentation, including insurance, E‑Verify proof, waste‑shipment records, and final payment applications.
• Wet‑method demolition of all structures, footings, and foundations.
• Comprehensive environmental controls (lead‑paint, asbestos, sediment, dust).
• Post‑demolition site restoration (seeding, mulching) and final close‑out paperwork.