Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Engineering Services
  5. ›NACIMIENTO PIPELINE CATHODIC PROTECTION CLOSE INTERVAL…

Awarded contract·County of San Luis Obispo - Public Works·California

NACIMIENTO PIPELINE CATHODIC PROTECTION CLOSE INTERVAL POTENTIAL SURVEY

Won by Corrpro Companies, Inc.$300kSingle Award
Contract source

Awarded vendors

  • Corrpro Companies, Inc.

Description

The County of San Luis Obispo is seeking a NACE certified engineering consultant to perform a Close Interval Potential Survey (CIPS) for the Nacimiento Water Project Pipeline. The work shall be performed by NACE International Cathodic Protection Technicians, Technologist and Specialist under the supervision of a California Registered Corrosion Professional Engineer. The contract was awarded to Corrpro Companies, Inc. • The contract is for the Nacimiento Pipeline Cathodic Protection Close Interval Potential Survey. • The work shall be performed by NACE International Cathodic Protection Technicians, Technologist and Specialist. • The contract was awarded to Corrpro Companies, Inc. • The County of San Luis Obispo has established a 5% Local Vendor Preference.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Engineering Services
NAICS
541330
Solicitation №
1393

Contract value

$300,000

The value of the contract is not explicitly stated in the document. However, based on the scope of work, which includes a Close Interval Potential Survey for the Nacimiento Water Project Pipeline, the value of the contract can be estimated to be in the range of $100,000 to $500,000. This is a rough estimate and the actual value of the contract may be higher or lower.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Defense·Florida

Top match · 71%

CATHODIC PROTECTION SURVEY/INVENTORY/ASSESSMENT SERVICES

Closes 11/23/2026Opened 10/21/2026

Loudoun Water·Virginia

69% match

Cathodic Protection Testing Services

Closes 11/20/2026Opened 10/26/2026

County of San Luis Obispo·California

66% match

Nacimiento Water Project Unit G Repair Construction Management

Closes 11/3/2026Opened 9/29/2026

Power Authority of New York·New York

65% match

CATHODIC PROTECTION SERVICES

Closes 11/3/2026Opened 10/13/2026

South Tahoe Public Utility District·California

65% match

On-Call Corrosion Protection Services

Closes 7/20/2028Opened 7/20/2023

Loudoun Water·Virginia

64% match

RFP 2026-071-1400002-Cathodic Protection Testing Services

Closes 11/20/2026Opened 10/26/2026

City of Cortez·Colorado

62% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

62% match

53--ANODE,CORROSION PREVEN

Closes 11/3/2026Opened 10/28/2026

Imperial Irrigation District·California

62% match

Construction Services for Protection Relays Replacement Programs

Closes 11/24/2026Opened 9/29/2026

City of San Bernardino·California

62% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

City of Corona·California

62% match

Energy Control Procedures (ECP / Lockout Tagout Program) – WRF 2 Assessment and Implementation Project

Closes 11/3/2026Opened 10/1/2026

City of El Mirage·Arizona

61% match

Arc Flash Hazard Analysis Study

Closes 11/10/2026Opened 10/9/2026

U.S. Department Of The Interior·Colorado

61% match

INJECTION WELL FAILURE MODE EVALUATION

Closes 11/10/2026Opened 10/13/2026

The Metropolitan Water District of Southern California·California

61% match

LARGE DIAMETER CONCRETE & METALLIC PIPELINE INSPECTION SERVICES

Closes 12/3/2026Opened 10/19/2026

San Antonio Water System·Texas

61% match

1-Time Purchase of 54-inch Pipe Cleaning at Agua Vista WTP

Closes 11/5/2026Opened 10/15/2026

City of Redlands·California

61% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Connecticut Dept. of Correction·Connecticut

60% match

INSTALLATION OF IMPRESSED CURRENT CP SYSTEM

Closes 11/4/2026Opened 10/21/2026

CPS Energy·Texas

60% match

High Energy Pipe (“HEP”) Inspection and Program Management Services

Closes 11/19/2026Opened 10/22/2026

Connecticut Dept. of Correction·Connecticut

60% match

INSTALLATION OF IMPRESSED CURRENT CP SYSTEM

Closes 11/4/2026Opened 10/21/2026

U.S. National Energy Technology Laboratory·United States of America

60% match

Improved Oil and Gas Recovery and Produced Water Management Technologies

Rolling / TBD closeOpened 7/6/2026

Colorado Department of Public Health and Environment·Colorado

60% match

California Gulch Groundwater Monitoring

Closes 11/25/2026Opened 10/23/2026

U.S. Department Of Defense·California

60% match

BRINE PIPELINE ACCESS IMPROVEMENTS

Closes 2/4/2027Opened 8/12/2026

City of Rancho Palos Verdes·California

60% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

U.S. Geological Survey·United States of America

60% match

Cooperative Agreement for affiliated Partner with Northern Great Plains Cooperative Ecosystem Studies Unit

Closes 11/14/2026Opened 10/14/2026

Corrections and Community Supervision, NYS Dept. of·New York

60% match

ARC FLASH

Closes 12/9/2026Opened 8/12/2026