The Long Ravine Pipe Replacement project involves the construction of approximately 600 feet of 24-inch raw water pipeline, approximately 5,100 feet of 30-inch raw water pipeline, a pressure sustaining station, an intake structure, and 950 feet of gravel road. The estimated cost of construction is $7,000,000. The contract was awarded to Sierra Mountain Construction, Inc. with a bid price of $6,582,405.00. The project requires a mandatory pre-bid walk-through meeting and has a contract time of 350 calendar days to achieve final completion. Key aspects of the project include:
• Construction of raw water pipelines
• Installation of a pressure sustaining station
• Construction of an intake structure
• Building of a gravel road
• Mandatory pre-bid walk-through meeting
• Contract time of 350 calendar days