Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Kansas guideKansas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Kansas
  4. ›Water and Wastewater
  5. ›ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacem…

City of Salina·Kansas

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD close$2M – $5MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Salina is seeking contractors to replace its municipal water distribution mains under Project 26017. The addendum clarifies general notes, removes a pipe‑thickness requirement for directional bore installations, and provides technical specifications for valve‑box removal, shoring, top‑soil placement, meter‑pit installation, and material selections (ductile‑iron, copper, limited HDPE). Bidders must acknowledge receipt of this addendum and comply with OSHA shoring requirements. • Remove existing valve boxes at least 24 in. below finish grade; roadway boxes require a 3 ft × 3 ft excavation. • Provide 6 in. of commercial‑grade topsoil in all excavations and disturbed areas. • Directionally bored ductile‑iron pipe follows pressure class 350 (≤12 in.) or 250 (≥16 in.) – the Class 50 thickness clause is removed. • Meter‑setter installation details, HDPE usage restrictions, and shoring obligations are detailed in the Q&A section.

Attached files

Contact

Martha Tasker(Director of Utilities)

[email protected]

(785) 309-5725

Key dates

Opened
8/3/2026
Closes
Rolling / TBD

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
Project 26017 – 2026 Water Mains Replacement

Budget estimate

$2,000,000 – $5,000,000

No contract value is disclosed in the addendum. Based on typical municipal water‑main replacement projects of comparable size (several miles of 12‑ to 24‑in. ductile‑iron pipe, extensive excavation, shoring, and meter‑pit work), a reasonable contract value would likely fall between $2 million and $5 million. This range accounts for material costs (ductile‑iron, copper, HDPE), labor for shoring and excavation, and contingency allowances for unknown field quantities.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Salina·Kansas

Top match · 98%

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Salina·Kansas

97% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Salina·Kansas

97% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/6/2026

City of Salina·Kansas

96% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

City of Salina·Kansas

90% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/5/2026

City of Muskogee·Oklahoma

85% match

Addendum 1 - HWY 165 Waterline Extension

Rolling / TBD closeOpened 9/16/2026

City of Salina·Kansas

82% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/18/2026

City of Salina·Kansas

82% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/21/2026

City of Salina·Kansas

82% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/21/2026

City of Cerritos·California

82% match

Addendum No. 1

Rolling / TBD closeOpened 8/5/2026

San Gabriel Unified School District·California

82% match

Addendum One_Narrative - McKinley Irrigation Replacement

Rolling / TBD closeOpened 8/4/2026

City of Ontario·California

82% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Salina·Kansas

81% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/14/2026

City of Salina·Kansas

81% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/19/2026

City of Salina·Kansas

81% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/16/2026

City of Salina·Kansas

81% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/15/2026

City of Salina·Kansas

81% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/12/2026

City of Salina·Kansas

81% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/4/2026

City of Salina·Kansas

81% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/25/2026

City of Salina·Kansas

81% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/12/2026

City of Salina·Kansas

81% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/2/2026

City of Salina·Kansas

81% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 9/12/2026

City of Salina·Kansas

81% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/20/2026

City of Salina·Kansas

80% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 9/11/2026

City of Salina·Kansas

80% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/15/2026