Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Kansas guideKansas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Kansas
  4. ›Water and Wastewater
  5. ›ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacem…

City of Salina·Kansas

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD close$1M – $5MInvitation for Bid
Get bids like this by emailBid source

Description

• Minimum 24 in. depth for valve‑box removal; 3 ft × 3 ft roadway removal when in roadways. • Provide at least 6 in. of commercial‑grade topsoil at all excavations. • Concrete core removal requires 3 ft × 3 ft roadway removal; full driveway or sidewalk panel replacement where cores intersect those features. • Contractor must supply and install all OSHA‑required shoring. • Pipe pressure classes: ≤ 12 in. ductile‑iron – Class 350; ≥ 16 in. – Class 250; “Class 50” clause removed for directional‑bored pipe. • Meter‑pit sizing: 2‑in. & 1.5‑in. meters use 36 in. × 30 in. pits; 1‑in. meters use 24 in. × 30 in. pits. • Only Type K copper allowed for short service lines; HDPE prohibited. • Two directional bores under the storm sewer are required; other installations may use open‑cut or directional drilling.

Attached files

Contact

Martha Tasker(Director of Utilities)

[email protected]

(785) 309-5725

Key dates

Opened
8/5/2026
Closes
Rolling / TBD

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
26017 – 2026 Water Mains Replacement

Budget estimate

$1,000,000 – $5,000,000

No specific contract value is disclosed in the addendum. Based on typical municipal water‑main replacement projects of this size (city‑wide, involving extensive excavation, shoring, directional boring, and material procurement), a reasonable budget range would be roughly $1 million to $5 million. The lower end assumes minimal mileage and modest pipe diameters, while the upper end reflects higher‑diameter pipe, extensive pavement restoration, and labor‑intensive shoring.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Salina·Kansas

Top match · 92%

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/6/2026

City of Salina·Kansas

90% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Salina·Kansas

90% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026

City of Salina·Kansas

88% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Salina·Kansas

87% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

City of Muskogee·Oklahoma

80% match

Addendum 1 - HWY 165 Waterline Extension

Rolling / TBD closeOpened 9/16/2026

City of Shawnee·Kansas

79% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

Georgia City of Sandy Springs·Georgia

79% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

Burlington Township·New Jersey

78% match

Addendum #1 - "Milling & Overlay of Various Streets", Contract No. 2024-07

Rolling / TBD closeOpened 4/20/2026

City of Cerritos·California

78% match

Addendum No. 1

Rolling / TBD closeOpened 8/5/2026

City of Cincinnati·Ohio

78% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/12/2026Opened 9/17/2026

City of Pawtucket·Rhode Island

78% match

Addendum No. 1 to RFP 27-008

Closes 1/14/2027Opened 7/21/2026

City of Muskogee·Oklahoma

78% match

Addendum 1 RFQ UST Removal

Rolling / TBD closeOpened 8/7/2026

Delaware County Regional Sewer District·Ohio

78% match

Tartan Fields Manhole Replacement

Closes 11/13/2026Opened 10/13/2026

Town of Lexington·South Carolina

77% match

ADDENDUM 2 CHERRY RIDGE DRAINAGE IMPROVEMENT PROJECT

Closes 10/29/2027Opened 10/27/2026

The Village of Royal Palm Beach·Florida

77% match

SR80 Irrigation Boring

Closes 11/13/2026Opened 10/30/2026

City of Salina·Kansas

77% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 9/15/2026

City of Ontario·California

77% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Massachusetts Town of Westborough·Massachusetts

77% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

Alaska Department of Environmental Conservation·Alaska

77% match

Aleutian Homes Phase VII Water and Sewer Determination of Categorical Exclusion

Rolling / TBD closeOpened 8/17/2026

City of DeLand·Florida

77% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

Goodwyn Mills Cawood·Georgia

77% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Hastings Utilities·Nebraska

77% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

City of Peachtree City·Georgia

76% match

Tuxedo Lane Drainage Improvements (amended)

Closes 11/17/2026Opened 10/15/2026

U.S. Department Of Defense·Kansas

76% match

Atchison Storm Sewer Separation Improvements, Atchison, Kansas

Closes 11/13/2026Opened 10/13/2026