Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Kansas guideKansas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Kansas
  4. ›Water and Wastewater
  5. ›ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacem…

City of Salina·Kansas

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD close$2M – $5MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Salina’s 2026 Water Mains Replacement project (ID 26017) calls for the removal and replacement of aging water‑main infrastructure, associated valve boxes, and related roadway/sidewalk concrete work. The addendum clarifies technical requirements, such as minimum excavation depths, shoring responsibilities, and material standards (ductile‑iron pipe pressure classes, Type K copper for short services). Bidders may choose open‑cut trenching or directional boring, with two mandatory directional bores under an existing storm sewer. No monetary values or schedule dates are disclosed in this addendum. • Revised general notes require minimum 24‑in. box depth, 6 in. of commercial‑grade topsoil, and contractor‑provided OSHA‑compliant shoring. • Specification changes remove pipe‑thickness constraints for directionally bored pipe; ductile‑iron pipe must meet Pressure Class 350 (≤ 12 in.) or Class 250 (≥ 16 in.). • Meter‑pit dimensions and copper service‑line requirements are detailed; adapters for sub‑1‑in meters must be supplied by the contractor. • Both open‑cut and directional‑boring methods are permitted; two directional bores are mandatory beneath a storm sewer.

Attached files

Contact

Martha Tasker(Director of Utilities)

[email protected]

(785) 309-5725

Key dates

Opened
8/6/2026
Closes
Rolling / TBD

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
26017 2026 Water Mains Replacement

Budget estimate

$2,000,000 – $5,000,000

The addendum contains no price information, but comparable municipal water‑main replacement projects in Kansas typically range from $2 million to $5 million depending on mileage, pipe size, and extent of roadway restoration. Assuming a mid‑size effort (≈ 5 mi of main, multiple valve boxes, and associated concrete work), a realistic contractor earnings window could be roughly $2 M‑$5 M. Factors influencing the final amount include the chosen installation method (directional boring vs. open cut), the amount of shoring required, and the cost of supplying copper service‑line adapters and topsoil.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Salina·Kansas

Top match · 97%

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Salina·Kansas

97% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026

City of Salina·Kansas

96% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Salina·Kansas

95% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

City of Salina·Kansas

92% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/5/2026

City of Muskogee·Oklahoma

84% match

Addendum 1 - HWY 165 Waterline Extension

Rolling / TBD closeOpened 9/16/2026

City of Salina·Kansas

82% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/21/2026

San Gabriel Unified School District·California

81% match

Addendum One_Narrative - McKinley Irrigation Replacement

Rolling / TBD closeOpened 8/4/2026

City of Salina·Kansas

81% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/14/2026

City of Cerritos·California

81% match

Addendum No. 1

Rolling / TBD closeOpened 8/5/2026

City of Salina·Kansas

81% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/18/2026

City of Salina·Kansas

81% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/16/2026

City of Ontario·California

81% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Salina·Kansas

81% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/19/2026

City of Salina·Kansas

81% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/15/2026

City of Salina·Kansas

80% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/12/2026

City of Salina·Kansas

80% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/21/2026

City of Salina·Kansas

80% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 9/12/2026

City of Salina·Kansas

80% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/12/2026

City of Salina·Kansas

80% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/2/2026

City of Salina·Kansas

80% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/25/2026

City of Shawnee·Kansas

80% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

Town of Lexington·South Carolina

80% match

ADDENDUM 2 CHERRY RIDGE DRAINAGE IMPROVEMENT PROJECT

Closes 10/29/2027Opened 10/27/2026

City of Salina·Kansas

80% match

Addendum%20%231%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 9/9/2026

Goodwyn Mills Cawood·Georgia

80% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026