This contract calls for the complete demolition of all structures at 2118 Barron Place in Mobile, Alabama, including wet demolition, utility disconnection, debris removal, and site restoration. The City of Mobile’s Municipal Enforcement Department issued a Request for Quote (RFQ) for a stipulated‑sum contract; the award went to the lowest responsive and responsible bidder. The contractor must manage lead‑based paint and asbestos disposal, implement temporary erosion‑control BMPs, and provide permanent site stabilization through seeding and mulching. Completion is required within 15 calendar days of the Notice to Proceed, with liquidated‑damage penalties for delays, and final close‑out must include photographs, waste records, and required AIA forms.
• Wet demolition of all structures, footings, slabs, and CMU/brick piers.
• Full utility cap‑off, hazardous‑material handling, and waste disposal to permitted landfills.
• Temporary BMPs (silt fencing, dust control) plus permanent top‑soil, seeding, and mulching.
• Strict documentation: before/after photos, waste shipment logs, AIA payment and lien affidavits, and newspaper notice of final completion.