The contract is for the SPMUD - Root Control Program 2020, which involves applying chemical root treatment to 111 mainline pipe segments. The contractor must furnish all labor, equipment, materials, plant, and supervision to perform the work. The project requires traffic control measures and pre-treatment root cutting. The contract was awarded to Duke's Root Control, Inc. with a base bid amount of $31,971.09. Key aspects of the contract include:
• Chemical root treatment for 111 mainline pipe segments
• Furnishing all labor, equipment, materials, plant, and supervision
• Traffic control measures and pre-treatment root cutting
• Base bid amount of $31,971.09
• Contractor: Duke's Root Control, Inc.