The contract is for design-build services for the replacement of Boze Elementary School. The project will be delivered using a progressive design-build contracting method, and the design-builder will be responsible for a full range of programming, design services, and deliverables. The contract was awarded through a request for qualifications (RFQ) process, and the shortlisted finalists will be moving forward to the RFP stage. The evaluation criteria and points allocations for the RFP stage are outlined in the RFP document. The contract is expected to include pre-construction services, and the district intends to notify the most highly qualified design-builder by close of business on February 27, 2018.
• The contract is for design-build services for the replacement of Boze Elementary School.
• The project will be delivered using a progressive design-build contracting method.
• The design-builder will be responsible for a full range of programming, design services, and deliverables.
• The contract was awarded through a request for qualifications (RFQ) process.
• The shortlisted finalists will be moving forward to the RFP stage.
• The evaluation criteria and points allocations for the RFP stage are outlined in the RFP document.