This contract awards Western State Design a sole‑source, fixed‑price agreement to supply, deliver, and install two Milnor M202 steam laundry dryers at the Washington Soldiers Home (Orting) and Washington Veterans Home (Port Orchard). The work includes demolition of existing equipment, concrete driveway construction, enclosure rebuild, utility connections (within 5 ft of points of connection), and full start‑up and training. The total contract ceiling is $150,287.28, covering equipment, freight, installation labor, and sales tax. The base period runs from 20 May 2026 to 30 September 2026 with a single optional three‑month extension.
• Delivery & installation of two high‑capacity Milnor M202 steam dryers (each ~200 lb capacity).
• Complete demolition, concrete work, enclosure reconstruction, and utility hookups limited to 5 ft from connection points.
• Fixed‑price contract with a $150,287 ceiling; includes equipment, freight, installation, and tax.
• Mandatory insurance (minimum $1 M each for CGL, Auto, Professional Liability) and prevailing‑wage compliance for Kitsap County.
• One‑time right‑to‑cure provision (30‑day notice, 7‑day plan, 21‑day correction) and termination‑for‑convenience clause (10‑day notice).