Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Winkler Avenue and Challenger Boulevard Roundabout, FDOT…

Awarded contract·City of Fort Myers·Florida

Winkler Avenue and Challenger Boulevard Roundabout, FDOT Project #447820-1-58-01, ITB 0056-23

Won by EHC Inc$3MSingle Award
Contract source

Awarded vendors

  • EHC Inc

Description

The contract is for the construction of a roundabout at Winkler Avenue and Challenger Boulevard, FDOT Project #447820-1-58-01. The project is being managed by the City of Fort Myers, Engineering, Public Works department. The contract was awarded to EHC Inc. Key aspects of the project include the construction of a roundabout, with the goal of improving traffic flow and safety in the area. Some of the key features of the project may include: • Construction of a single-lane roundabout • Installation of traffic signals and lighting • Landscaping and drainage improvements • Coordination with local businesses and residents to minimize disruptions The contract duration is 420 days, starting from April 2, 2024, and ending on June 16, 2025.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Starts
4/2/2024
Ends
6/16/2025
Duration
420 days

Last updated

Details

Award type
Single Award
Industry
Construction
NAICS
237310
Solicitation №
0056-23

Contract value

$3,000,000

The contract value is not explicitly stated in the document, but based on the project description, it is likely a significant construction project. The value could be estimated in the range of $1 million to $5 million, considering the scope of work, which includes construction of a roundabout, traffic signals, and landscaping. However, without more specific information, it is difficult to provide a more precise estimate. Factors that may influence the contract value include the complexity of the project, the materials and labor required, and the location of the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Miami‑Dade County Department of Transportation and Public Works·Florida

Top match · 70%

Traffic Circle at NW 52nd Ave. And NW 191st St.

Closes 12/9/2026Opened 10/30/2026

City of Smithville·Missouri

68% match

RFP 26-07 Bridge Street Roundabout Improvements

Closes 11/3/2026Opened 9/29/2026

Missouri Department of Transportation·Missouri

68% match

KC District, City of Gladstone, Improving N. Oak Trafficway from NE 69th Street to NE 72nd.

Closes 11/3/2026Opened 9/24/2026

Alaska Department of Transportation and Public Facilities·Alaska

68% match

ITB NFHWY00962 FAST ADA Improvements - Fairbanks: 6th and 7th Avenues

Closes 11/17/2026Opened 10/27/2026

City of Charlotte·North Carolina

68% match

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

Missouri Department of Transportation·Missouri

68% match

KC District, City of Smithville, construction of a single lane roundabout at the intersection of Bridge Street

Closes 11/3/2026Opened 9/30/2026

City of Fort Wayne·Indiana

67% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

City of Foley·Alabama

67% match

Wilson Ave. & Equestrian St. Construction

Closes 11/17/2026Opened 10/22/2026

County of Monterey·California

67% match

Prunedale Roundabout, Project No. 1176

Closes 11/18/2026Opened 9/18/2026

City of Ankeny·Iowa

67% match

North Ankeny Boulevard & NW Reinhart Drive Traffic Signal and Turn Lanes

Closes 11/10/2026Opened 10/21/2026

City of Fort Wayne·Indiana

67% match

0963C - Five Points Neighborhood Concrete Repairs

Closes 11/12/2026Opened 10/29/2026

Massachusetts City of Brockton·Massachusetts

67% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

Idaho Transportation Department·Idaho

67% match

Key No. 23731 NORTHSIDE BLVD & KARCHER RD

Closes 11/17/2026Opened 10/29/2026

City of Danville·Virginia

67% match

IFB-26-27-024-Curb Market Parking Lot Improvements

Closes 11/3/2026Opened 10/8/2026

Alaska Department of Transportation and Public Facilities·Alaska

67% match

ITB NFHWY00914 FAST Area Surface Upgrades FFY2026

Closes 11/3/2026Opened 10/13/2026

Georgia City of Powder Springs·Georgia

67% match

IFB # 26-003 - Powder Springs Access Road Project

Closes 11/6/2026Opened 10/9/2026

Massachusetts Department of Transportation·Massachusetts

67% match

611974 MEDFORD FAP No. HSI/HSI(VUS)-003S(991)X Intersection Improvements at Main Street/South Stre

Closes 11/10/2026Opened 9/14/2026

City of Richmond Government·Virginia

66% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Minnesota Department of Transportation·Minnesota

66% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

City of Oldsmar·Florida

66% match

St. Petersburg Drive Complete Streets and Roundabout Project

Closes 12/8/2026Opened 8/7/2026

City of Ontario·California

66% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Tucson·Arizona

66% match

Sahuara and Copper/Flower Bicycle Boulevards - FHWA

Closes 11/3/2026Opened 9/24/2026

City of Dayton·Ohio

66% match

Patterson Boulevard Rehabilitation

Closes 11/12/2026Opened 10/29/2026

City of Bartow, FL·Florida

66% match

Main Street Concrete Curbing, Sidewalk, and Driveways.

Closes 11/25/2026Opened 10/20/2026

County of DeKalb, GA·Georgia

66% match

Stewart Mill Road at Bermuda Road Roundabout (12 Months)

Closes 11/4/2026Opened 8/17/2026