This contract is a sealed‑bid, lump‑sum award for entry‑way renovations at the Fanning School in Worcester, MA. The work includes demolition of existing doors, stairs, railings, and concrete walkways; installation of an accessible ramp system, new doors, hardware, and new concrete walk‑ways; asbestos and hazardous‑material abatement; re‑grading, re‑planting, and masonry repairs; and associated civil‑works, electrical, and finishing trades. The City of Worcester’s Purchasing Division administered the procurement, and JAM Corporation was selected as the low‑price, responsive bidder at $139,000. The project must start no earlier than June 19 2025 and achieve substantial completion by August 22 2025, with strict compliance to prevailing‑wage, MWBE participation, safety, and environmental regulations.
• Scope: demolition, concrete, masonry, metal railings, doors, accessibility ramp, hazardous‑material removal, and site restoration.
• Timeline: ~2 months of construction (June 19 – August 22 2025).
• Regulatory: Prevailing‑wage (MA), MWBE goals, OSHA/lead/Asbestos compliance, insurance, bonds, and weekly payroll reporting.