The contract is for the installation of chain-link fencing at the Harold Street Wastewater Treatment Plant in Olathe, Kansas. The project includes the provision of all labor and materials necessary for the installation. The contract was awarded to AmeriFence Corporation and Guier Fence, with bids of $99,745.00 and $171,600.00, respectively. The scope of work includes the installation of fencing and gates, as well as any necessary excavation and site preparation.
• The project requires the installation of chain-link fencing at the Harold Street Wastewater Treatment Plant.
• The contract includes the provision of all labor and materials necessary for the installation.
• The contract was awarded to two vendors, AmeriFence Corporation and Guier Fence.
• The bids for the project were $99,745.00 and $171,600.00, respectively.
• The scope of work includes the installation of fencing and gates, as well as any necessary excavation and site preparation.