This contract calls for the complete asbestos‑containing material (ACM) abatement and “wet” demolition of ten single‑story residential structures at the Woodlawn Apartments site in Mobile, Alabama, followed by site remediation, utility capping, erosion control, and grass seeding. The work must be performed in strict compliance with EPA, ADEM, and local environmental regulations, with extensive documentation and air‑monitoring requirements. The contractor must mobilize within ten business days of receiving a Notice to Proceed and finish all demolition, remediation, and site‑restoration activities within ninety calendar days, with liquidated damages of $250 per day for schedule overruns or delayed close‑out. The City requires a 15 % DBE participation, specific licensing (Alabama General Contractor – Building Construction or Demolition), performance and labor‑material bonds (for bids ≥ $10 k), and insurance coverage meeting defined minimums. The award was made to Virginia Wrecking Company, Inc., though no contract price is disclosed.