The contract is for the extension of a 24" trunk sewer main from the existing main at the intersection of 143rd Avenue and Seger Drive to the Country Road Lift Station, with a total length of approximately 1.5 miles. The project includes rebuilding the roads impacted by the sewer construction as rural pavement sections. The engineer's estimate for the project is $7,862,000.00, and the bid results show a total bid amount of $8,963,767.66 from the single bidder, Mainline. Key aspects of the contract include the scope of work, which involves sewer construction and road rebuilding, and the bid process, which resulted in a single bid from Mainline. The contract is likely to be awarded to Mainline, given their bid amount and the fact that they are the only bidder listed.
• The project involves the extension of a 24" trunk sewer main
• The total length of the project is approximately 1.5 miles
• The project includes rebuilding the roads impacted by the sewer construction
• The engineer's estimate for the project is $7,862,000.00
• The bid results show a total bid amount of $8,963,767.66 from Mainline