Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Construction
  5. ›2019 Pipe Culvert Repairs & Replacement

Awarded contract·Carroll County Government - Public Works Bureau Of Engineering·Maryland

2019 Pipe Culvert Repairs & Replacement

Won by Stambaugh's, Inc. +3 more$650kMultiple Award
Contract source

Awarded vendors

  • Stambaugh's, Inc.
  • C. J. Miller, LLC
  • Triangle Contracting, Inc.
  • Concrete General, Inc.

Description

The contract is for the 2019 Pipe Culvert Repairs & Replacement project, which involves the installation, repair, and replacement of pipe culverts, as well as all incidental work. The project is located in Carroll County, Maryland, and the cost estimate for the project is between $100,001 and $500,000. The contract was awarded to four vendors: Stambaugh's, Inc., C. J. Miller, LLC, Triangle Contracting, Inc., and Concrete General, Inc. The scope of work includes clearing and grubbing, maintenance of traffic, temporary traffic signs, mobilization, excavation, and backfilling, among other tasks. • The project consists of pipe culvert repairs and replacements on selected roadways from the County's 2019 paving contracts. • The cost estimate for the project is between $100,001 and $500,000. • The contract was awarded to four vendors: Stambaugh's, Inc., C. J. Miller, LLC, Triangle Contracting, Inc., and Concrete General, Inc. • The scope of work includes clearing and grubbing, maintenance of traffic, temporary traffic signs, mobilization, excavation, and backfilling, among other tasks. • The project requires the installation of various types of pipes, including corrugated steel pipes and polyethylene pipes. • The contract includes a bid tabulation section, which lists the bids submitted by each vendor for each item of work.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237
Solicitation №
80-F-5-18/19

Contract value

$650,000

The contract value can be estimated based on the bid tabulation section, which lists the bids submitted by each vendor for each item of work. The total bid values for each vendor are: Stambaugh's, Inc. ($386,255.00), C. J. Miller, LLC ($399,461.00), Triangle Contracting, Inc. ($459,000.00), and Concrete General, Inc. ($913,281.00). The lowest bid value is $386,255.00, and the highest bid value is $913,281.00. Therefore, the estimated contract value is between $386,255.00 and $913,281.00.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Ladue·Missouri

Top match · 72%

2025 Culvert Repairs Project - Ladue, MO

Closes 11/5/2026Opened 10/6/2026

City of Bellevue·Washington

69% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

Oregon Department of Transportation·Oregon

69% match

US199 @ Demaray Dr MP 2.33 Culvert Replacement Project

Closes 11/11/2026Opened 10/27/2026

U.S. Department Of Defense·New Hampshire

68% match

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Closes 11/23/2026Opened 10/21/2026

City of Charlotte·North Carolina

68% match

Pipe Patching Services

Rolling / TBD closeOpened 6/29/2026

Virginia Department of Transportation·Virginia

68% match

B32_ 2027 CULVERT REHAB

Closes 11/18/2026Opened 10/13/2026

City of Chula Vista·California

67% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

Spartanburg County Government·South Carolina

66% match

Walnut Church Hill Road Culvert Replacement

Closes 11/10/2026Opened 10/7/2026

Greenwood Metropolitan District·South Carolina

66% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

NYS Phelps, Town of·New York

66% match

Culvert Replacement Project Melvin Hill Road over Tributary to Canandaigua Outlet

Closes 11/10/2026Opened 10/20/2026

Saline County·Kansas

66% match

2027 Roadway Materials - Pipe Culverts

Closes 11/10/2026Opened 10/9/2026

St. John the Baptist Parish Government·Louisiana

66% match

Bid 2026.23 Culverts and Drainage Improvements Project

Closes 11/19/2026Opened 10/21/2026

Board of Commissioners of the County of Allen·Indiana

66% match

Knouse Road Culvert Replacement

Closes 11/10/2026Opened 10/21/2026

City of Sidney·Ohio

66% match

26-26 Brookside Park Culvert

Closes 11/5/2026Opened 10/21/2026

City of Shawnee·Kansas

66% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of West Des Moines·Iowa

66% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

Massachusetts City of Gardner·Massachusetts

66% match

2027-011 Keyes Road Culvert Replacement

Closes 11/5/2026Opened 10/7/2026

Georgia Union County Commissioner·Georgia

65% match

Spiva Cove Bridge Replacement and Kiutuestia Creek Road Culvert Repair at Lows Mill Road

Closes 11/19/2026Opened 10/13/2026

Arkansas Department of Transportation - Equipment and Procurement·Arkansas

65% match

Corrugated Pipe Culvert Supply Contract

Closes 11/10/2026Opened 10/27/2026

Snohomish County·Washington

65% match

2027 123rd Ave NE Culvert Replacements – RR48109, WC8109, UPI 21-20028

Closes 11/3/2026Opened 9/30/2026

City of Marysville, Ohio·Ohio

65% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

Park County Public Works·Wyoming

65% match

Willwood Road Improvements Project- Phase 2 Culverts

Closes 11/16/2026Opened 10/16/2026

City of Charlotte·North Carolina

65% match

Collective Culverts 1 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/11/2028

New York State Department of Transportation·New York

65% match

D265814 CULVERT REPLACEMENTS - Route 22 and Route 67 Culverts in the Towns of Ballston, Milton & Willsboro.

Closes 11/12/2026Opened 10/20/2026

Town of Honea Path·South Carolina

65% match

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026