The contract is for the 2019 Pipe Culvert Repairs & Replacement project, which involves the installation, repair, and replacement of pipe culverts, as well as all incidental work. The project is located in Carroll County, Maryland, and the cost estimate for the project is between $100,001 and $500,000. The contract was awarded to four vendors: Stambaugh's, Inc., C. J. Miller, LLC, Triangle Contracting, Inc., and Concrete General, Inc. The scope of work includes clearing and grubbing, maintenance of traffic, temporary traffic signs, mobilization, excavation, and backfilling, among other tasks.
• The project consists of pipe culvert repairs and replacements on selected roadways from the County's 2019 paving contracts.
• The cost estimate for the project is between $100,001 and $500,000.
• The contract was awarded to four vendors: Stambaugh's, Inc., C. J. Miller, LLC, Triangle Contracting, Inc., and Concrete General, Inc.
• The scope of work includes clearing and grubbing, maintenance of traffic, temporary traffic signs, mobilization, excavation, and backfilling, among other tasks.
• The project requires the installation of various types of pipes, including corrugated steel pipes and polyethylene pipes.
• The contract includes a bid tabulation section, which lists the bids submitted by each vendor for each item of work.