The 2019 Sewer Main Lining Project involves the provision of sewage bypass pumping, cleaning and video inspection of sewer pipe, root cutting, construction of Cured In-Place Pipe (CIPP) Class III structural lining, installation of lateral sewer service cured-in-place liner, and sprayed-in epoxy sewer manhole lining. The project was awarded to Green Mountain Pipeline Services for $336,302.00. The project is part of the City of Keene's Public Works department and is funded by the FY19 budget.
• The project includes the provision of sewage bypass pumping to accommodate up to two times the peak measured flow of approximately 500 GPM for a minimum distance of 600 feet.
• The project includes the cleaning and video inspection of sewer pipe, root cutting as necessary.
• The project includes the construction of CIPP Class III structural lining within 435 feet of 6” Cast Iron pipe, 1,568 feet of 10-inch Vitrified Clay pipe (VC) and 2,168 feet of 12-inch Asbestos Cement (AC) pipe.
• The project includes the installation of 35 lateral sewer service cured-in-place liner (Rim Cap).
• The project includes the provision of sprayed-in epoxy sewer manhole lining, up to 132.5 vertical feet in 17 manholes.