The contract is for the 2015 Street Preservation Program – Harold Street Arterial Mill & Overlay Project. The work consists of milling and asphalt resurfacing, spot deep milling, subgrade repair, concrete curb and gutter replacement, sidewalk and ADA ramp replacement, limited storm sewer replacement, traffic signal detection loop replacement, pavement marking, and traffic control. The contract was awarded to Freeman Concrete Construction, LLC. Key aspects of the contract include:
• The project involves the construction of the 2015 Street Preservation Program – Harold Street Arterial Mill & Overlay.
• The work includes milling and asphalt resurfacing, spot deep milling, subgrade repair, and other related tasks.
• The contract was awarded to Freeman Concrete Construction, LLC.
• The engineer's estimate for the project is $843,113.50.
• The contract requires a satisfactory bid bond executed by the bidder or an acceptable surety, in an amount equal to five percent (5%) of the total bid for work.