This contract awards the supply of octagonal, prestressed concrete distribution poles for the City of Dothan’s electric utility system. The procurement was conducted through an open competitive bid (22‑146) and awarded to Meyer Utility Structures, which met the required octagonal specifications and offered the lowest compliant unit price. The award includes multiple pole lengths (35 ft, 50 ft, 55 ft) with flexible quantities and delivery lead times of 6‑8 weeks.
• Agency: City of Dothan Utilities (Alabama)
• Awarded Vendor: Meyer Utility Structures (Bay Minette, AL)
• Scope: Octagonal concrete utility poles, Class 1, various lengths
• Pricing: Unit‑price basis (e.g., $2,128 per 35‑ft pole)
• Delivery: 6‑8 weeks after order receipt, quantities “10 each (more or less)” etc.