The contract is for the removal, disposal, re-installation, and restoration of multiple cross drain culvert pipes at sixty-nine locations throughout the City of Palm Bay's Port Malabar Unit (PMU) 32. The project includes all incidentals required to complete the project, such as utility relocations, material furnishings, and restoration work associated with the installation of the culvert pipes. The contractor is required to furnish plans to the City at least two weeks prior to implementation to allow adequate review and approval time. A pre-construction video shall be taken to document existing conditions of each location prior to mobilization.
• The contract was awarded to Hinterland Group, Inc. for an amount of $632,942.00.
• The bid submission date was June 4, 2019.
• The notice of award was posted on June 26, 2019.
• The project includes a turnkey project and shall include all incidentals required to complete the project.
• The contractor is required to include all Maintenance of Traffic (MOT) costs required in the bid as part of the project construction cost.