The purpose of this project is to purchase and install a new pole building at the Carroll County Maintenance Center. The contract was awarded to Heritage Post Frame, LLC. for $149,800.00. The project includes the installation of a pole building, and the contractor is required to provide a bid bond and references. The contract was awarded on February 20, 2025.
• The contract is for the purchase and installation of a pole building.
• The contract was awarded to Heritage Post Frame, LLC.
• The contract amount is $149,800.00.
• The contract includes the installation of a pole building.
• The contractor is required to provide a bid bond and references.