This contract calls for the complete replacement of the Beeman Brook trunk sewer system at the intersection of Woodland Avenue and Peters Road in Bloomfield, CT. The scope includes removing and installing approximately 403 linear feet of 12‑inch pipe and 742 linear feet of 15‑inch sanitary sewer pipe, constructing nine new service laterals (totaling about 280 feet of 6‑inch pipe), and performing full‑width mill‑and‑overlay of the existing roadway. Additional work comprises clearing and grubbing, providing temporary travel ways, abandoning existing utilities, and installing necessary support equipment. The project requires a 10 % bid security and mandates that the successful bidder hold a current DAS Contractor Pre‑qualification Certificate for sewer and water lines, with any subcontractor valued at $500,000 or more also holding appropriate pre‑qualification. A mandatory pre‑bid conference was held on May 23 2017.
• Replacement of ~1,145 linear feet of sewer pipe (12‑in and 15‑in) and nine service laterals.
• Full‑width road reconstruction (mill & overlay) along the work corridor.
• Mandatory DAS pre‑qualification for the prime contractor and high‑value subs.
• 10 % bid security requirement and strict adherence to the MDC’s bid instructions.
Attached files
The award documents live at the source — open the contract source above to download them.