The Masonboro Loop Road Phase II municipal utility project is a multi‑use trail/road upgrade in Wilmington, NC that will involve extensive civil‑construction work, utility relocations, and environmental controls. The City of Wilmington is seeking a single‑prime contractor to execute a lump‑sum scope that includes earthwork, pavement, drainage structures, erosion control, signage, and traffic‑management installations, all to NCDOT standards.
• Core work packages: grading, sub‑base preparation, concrete curb & gutter, asphalt surface, utility (water, sewer, storm‑drain) relocation, and installation of pedestrian hybrid beacon signal systems.
• Supporting work: rip‑rap, stone fill, silt‑fencing, temporary traffic control devices, pavement markings, vegetation restoration, and detailed erosion‑control measures.
• Procurement requirements: NC Chapter 87 contractor licensing, NCDOT pre‑qualification, single‑prime sealed‑bid, 10 % DBE subcontracting goal, 90‑day bid guarantee, and adherence to NCDOT 2018 specifications.